At a glance
- A quotation is built from four blocks: material, setup, labour and packing — not from a single unit price.
- Quantity tiers exist because setup and yarn minimums are fixed costs spread over the run.
- Sample charges are normally credited against the bulk order; ask whether they are.
- Compare quotes on one specification sheet, otherwise the cheaper one is cheaper for a different product.
What a unit price is made of
A tassel price is a sum of four cost blocks. Material covers yarn, thread, the charm or cap, the tag and the packing film. Setup covers dyeing, tooling for a charm or a tag plate, and machine changeover. Labour covers twisting, cutting, knotting, assembly and hand finishing. Packing covers the bag, the header card, the carton and the labour to pack it.
When a supplier gives one number, it already contains all four. The useful question is not "what is your price" but "which of these four changes if I change the colour, the tag or the packing". Suppliers who can answer that are quoting from a cost model rather than from habit.
Why tiers exist
Setup cost is paid once per run. If a run is 500 pieces and the setup is fixed, every piece carries a large share of it; at 5,000 pieces the same setup is divided across ten times the units. That is the whole logic of a tier table.
Yarn minimums work the same way. A dyed lot has a minimum weight because dyeing equipment has a minimum bath. Below that weight the mill either refuses the lot or charges a small-lot premium, and both outcomes raise the unit price.
Sample and setup charges
First orders often carry a sample charge and, for custom colours or custom tags, a setup charge. Neither is profit — they recover a cost that a repeat order will not incur again.
Ask two questions before you approve them: is the sample charge credited against the bulk order, and does the setup charge cover tooling that stays with the supplier for your repeat orders. A supplier who keeps your tag plate and your dye recipe on file should be cheaper on order two, and it is fair to expect that in writing.
How to compare two quotes
Put both quotes against one specification sheet: product type, length, yarn composition, colour reference, tag or charm, packing format, quantity, destination and required delivery date. If any of those eight items differ, the prices are not comparable.
Then compare what is included. One quote may be EXW and the other FOB; one may include a woven tag and the other a printed one; one may include individual poly bags and the other bulk packing. Normalising these three items alone usually closes most of the apparent gap.
What to send for a tiered quote
Send the specification sheet plus the quantity range you are considering, for example 1,000 to 5,000 pieces. A supplier can then quote two or three tiers instead of one number, and you can see where the price curve flattens before you commit to an order size.
If your programme is seasonal, include the required arrival date. Capacity, not price, is usually the binding constraint in the eight weeks before a graduation or holiday season.