At a glance
- Artwork approval is a document, not an email — approve a physical or a print-ready proof.
- Tags and labels are the cheapest branding; charms and metal tooling carry setup cost.
- Give barcode and carton data up front so retail packing can be built into the schedule.
- Lock the standard: dip, sample, artwork and packing spec belong in one file kept by both sides.
Where the brand actually appears
On a tassel, the brand appears in four places: the year tag or charm, the hangtag, the poly bag or header card, and the retail box. Each has a different setup cost and a different minimum.
Woven and printed tags are the lowest-cost route and the most flexible for small programmes. Engraved or cast charms need tooling, which is a one-off cost that is worth paying only when the design will repeat.
Artwork approval
Artwork approval should produce a signed proof or a physical pre-production sample, with the colours specified in a way a printer can act on — a Pantone reference for print, a yarn reference for woven labels.
An email that says "looks good" is not an approval. When a label comes back in the wrong shade of navy, the only document that matters is the approved proof, and if it does not exist the cost usually lands on the buyer.
Retail packing data
If the product goes to retail, the packing specification includes the barcode, the carton mark, the inner pack ratio and any shelf requirement. These are data, not preferences, and they need to be supplied before the packing schedule is set.
A barcode added after packing means re-labelling every unit. A carton mark changed after the cartons are printed means new cartons. Both are entirely avoidable with one data sheet sent at the start.
Locking the standard for repeats
A repeat order is cheap only when nothing has to be re-approved. That means one file holding the approved dip, the approved sample, the approved artwork, the packing specification and the inspection brief, with a dated record of each approval.
Ask the supplier to confirm in writing that these are held on file against your programme code. It is the difference between a repeat order that ships in weeks and one that restarts at the sampling stage.